The facts of the construction of the small and medium manufacturing industrial cluster to be built by the Addis Ababa city administration
• The total budget is 7.7 billion birr to be built in Akaqi Kaliti district.
• The construction will be carried out by contractors called MCGTN Construction.
• The construction will create job opportunities for 18 to 20 thousand citizens.
• Industrial village processing of agricultural products; wood and metal works; textiles and clothing; construction materials; leather and leather products; Chemical and plastic products will also contain electronics and pharmaceutical factories.
• The construction will be done on 93 hectares of land.
• The construction is carried out by the city administration with its own budget.
• The construction will take place on a total of 93 hectares of land, with 21 sheds of different floors (B+G+4+4M); Eight one-story manufacturing sheds; It will have 400 suppliers and product shops.
• It has green and beautiful recreational areas.
• Lot one and lot three will be constructed first and the others will continue later.
• A three-zone parking lot that can park two hundred buses
• The industrial village will have its own well water generator
• Clinic will have day care and reception.
• It has its own drainage system.
It is an industrial zone equipped with modern systems.
- Category
- Kana Movie
